Royal Victoria Dock, London E14

Conservation, Offices, Regeneration, Residential, Urban Design and Masterplanning

Completed in 1858, the Victoria Dock (later part of the Royals) was the first fruit of the second great phase of dock building in the capital. Warehousing facilities were the…...

View Details

Foyleside Shopping Centre, Derry

Retail

Foyleside Shopping Centre is a shopping mall located in the city of Derry. It is a regional destination for comparison shopping. It is the main shopping destination within Derry with…...

View Details

Private Hospital Ward Out Patient Waiting Pods

Hotels, Hostels and Healthcare

A state of the art private patient facility within a major hospital. The proposed works are for the replacement of the existing waiting and reception area administration office and treatment…...

View Details

Chelsea and Westminster Hospital

Hotels, Hostels and Healthcare

Investment in gynaecology facilities at Chelsea and Westminster Hospital Chelsea and Westminster Hospital have opened two state-of-the-art units designed by architects at Studio. They combine the hospital’s gynaecology inpatient services…...

View Details

Royal Ballet School at Elizabeth House, Pimlico

Conservation, Hotels, Hostels and Healthcare

This comprehensive refurbishment, restoration extension and conversion of a dilapidated hotel created the accommodation for 64 senior students attending the Royal Ballet School in Floral Street and the residential apartments…...

View Details

Royal Ballet School at White Lodge, Richmond Park

Conservation, Cultural and Leisure Buildings

Will Caradoc-Hodgkins has been involved with the rolling restoration programme for this Grade 1 listed building in Richmond Park. Formerly a royal residence White Lodge now houses the Royal Ballet…...

View Details

St Piers School

Hotels, Hostels and Healthcare

To give a sense of the unique place that St Piers is I set out below the words of fundraiser Luke Cameron “Driving up the narrow lane in Lingfield to…...

View Details

Caspian Wharf

Regeneration, Residential

This high density substantial multi-award winning new residential quarter sets a benchmark for excellence with a successfully sustainable high quality mixed-use waterside development of 550 modern homes situated on the…...

View Details

Parliament Reach

Conservation, Residential

The site, a Major Development Opportunity site (MDO 90) is within a Conservation Area and comprises the Grade II Listed former Beaufort Institute that had been vacant since 2004. It…...

View Details

Senses, Cambridge

Residential

An award winning residential scheme, situated on the River Cam in Cambridge. It sets a high standard for housing design and creates 77 homes each with a wonderful river view.…...

View Details

South Molton Street Building

Offices, Residential, Retail

Studio Director Will Caradoc-Hodgkins was appointed by the Design and Build contractors McLaren to act as Executive Architect on this iconic retail design by DSDHA. It included three floors of…...

View Details

Glasshouse, Bermondsey

Residential

This air rights scheme of twelve live/work units overlooks the Conservation Area close to Bermondsey Street, London SE1. The site comprises the air-rights above the Glass House, an existing four-storey…...

View Details

Poplar Place

Residential

This striking sustainable development for Gallions Housing Association in south east London. The development is located on two separate sites adjoining the existing Poplar Place estate. The site of the…...

View Details

Waterside, Woking

Residential

This landmark residential scheme, is designed to form one side of the gateway entrance to the town centre of Woking. It sets a high standard for housing design and creates…...

View Details

Amersham Hospital

Conservation, Residential

Following the planning consent we achieved for our client these listed hospital buildings designed by Gilbert Scott were converted into 32 residential apartments. An additional 12 houses were then designed…...

View Details

Point Central

Regeneration, Residential

The existing building was a derelict office block built in the early 1960’s. It blighted the neigbourhood and created a no-go area around it. Our brief was to convert the…...

View Details
Back to Top